Buying guide
Three quotes, $4,000 apart. How to tell which is honest.
The spread between paving quotes for the same driveway is routinely enormous, and the reason is almost never greed. It is that they are quoting different work and almost none of them say so on paper.

The seven lines a real quote contains
Excavation depth in millimetres. Not 'excavate as required'. A number.
Geotextile — included or not. It is a small cost and a large difference.
Granular base thickness and how many lifts it goes in.
Compaction — passes per lift, or at minimum a statement that it is mechanically compacted rather than tamped.
Asphalt thickness, split into base course and surface course. Two numbers, not one.
Disposal — whether removing the old surface and excavated soil is included or extra.
Finished grade — the direction water will run when the job is done.
A quote that states all seven can be compared with another quote that states all seven. A quote that states none cannot be compared with anything.
What a missing line usually means
It is rarely dishonesty. It is that the number was built from a per-square-foot rate the contractor uses for everything, without a site-specific plan.
That works fine when conditions are typical. It goes wrong when the base is worse than assumed, and at that point either the scope quietly shrinks to protect the margin, or you get a change order.
The single most useful thing you can do with three quotes is email all three the same question: what excavation depth, what base thickness, how many lifts. The replies sort themselves.
The change-order question
Ask directly: is this a fixed price, and under what circumstances would it change?
A good answer names specific discoveries — unexpected fill, a buried slab, a service line — and says you will be shown and consulted before anything is done.
A vague answer, or 'we'll see when we get in there', is where budgets get away from people.
Questions
Is the cheapest quote always bad?
No. If your base is sound and the job is a resurfacing, a lower quote is often exactly right. The problem is a low price for work described as something more.
Should I pay a deposit?
A modest deposit for materials is normal on larger jobs. Being asked for most of the money before work starts is not.
What if a contractor will not put specs in writing?
Then you cannot compare their quote to anything, which is reason enough to keep looking.
Related
Keep reading
Free estimate
Questions about your own driveway?
We measure on site, probe the base and quote in writing within 48 hours.
Request my estimate